Final Touch Builders Inc. — Building Contractor & Roofing

Certified Building Contractor CBC1265305

A code notice, handled to the last signature

Unpermitted work, expired permits and cited conditions — corrected, re-inspected and closed with the building department.

Contractor reviewing drawings with a homeowner outside her house

What the job covers

A violation is a process with a defined end: the work meets code, the inspector signs off, the case closes. We read the notice, look at what was actually built, and take it through every step to that end.

  • Unpermitted additions, enclosures, conversions and renovations brought up to code.
  • Open or expired permits left by a previous owner or contractor, finished and closed.
  • Roof, window, door and garage door violations corrected under the right certification.
  • Failed inspections corrected and re-inspected.
  • After-the-fact permit applications where your jurisdiction allows them.
  • Clear written scope before any work starts, so you know what closing it involves.

How we take a notice to closed

  1. 1

    Read the notice

    Send us the paperwork. We explain in plain words what the building department is asking for.

  2. 2

    See the work

    We look at what was built and compare it against the permit history on file.

  3. 3

    Permit and correct

    We pull new permits or legalize existing work where allowed, and fix what doesn't meet code.

  4. 4

    Inspect and close

    Inspections booked and passed, permits closed, and the case closed with the city or county.

Why a certified building contractor fits this work

Clearing most violations needs a contractor of record: someone qualified to pull the permit, stand behind the work and see it through inspection.

Final Touch Builders holds both Florida Certified Building Contractor CBC1265305 and Certified Roofing Contractor CCC1334811, so structural, opening and roof violations can all be handled under one company.

You can verify both certifications at Florida DBPR.

Code violation questions

Can work done without a permit be legalized?
In many Florida jurisdictions there is an after-the-fact permit process. The work has to be shown to meet code, which sometimes means opening part of it up for the inspector. We manage the application, corrections and inspections.
The violation came with the house. Is it mine to fix?
Usually, yes — violations and open permits generally attach to the property. We review what you inherited and lay out what it will take to clear it.
Will the fines stop?
Each city and county handles fines and liens its own way, and the decision is theirs. Coming into compliance is always the first step, and many jurisdictions consider reductions once a case is closed.

Send us your notice

Tell us what the notice says, or simply that you received one. We'll review it and get back to you with a plan.

Prefer to talk?

(954) 620-7812

We only use your details to respond to your request. See our privacy policy.

(954) 620-7812Free estimate