Final Touch Builders Inc. — Building Contractor & Roofing

Certified Building Contractor CBC1265305 · Certified Roofing Contractor CCC1334811

A general contractor for additions & new construction in Davie, FL

Additions & New Construction for homes in Davie and the surrounding area — permitted, inspected and closed out. Free estimate.

In Davie, where the median home dates from about 1988 according to the Census, an addition usually starts at the permit counter, not with a hammer. A building permit, signed and sealed plans and zoning review typically come first, and Davie sits in Broward County's High-Velocity Hurricane Zone. When you choose who builds, look for a state-certified general contractor you can verify on the Florida DBPR website, who pulls the permit, schedules the inspections and closes the permit out.

Final Touch Builders holds Florida Certified Building Contractor license CBC1265305 and Certified Roofing Contractor license CCC1334811, both valid in every Florida county. We handle room additions, second-story additions, structural porch and patio enclosures and new single-family construction. Repairs, remodels and additions can run under one permit, with a free estimate and a written scope before work starts.

Davie is one of the few South Florida towns that kept large-lot, equestrian and ranch-style zoning, so a new room, barn-side structure or house can raise setback and site-plan questions that a tight suburban lot would not. Davie's low, canal-laced terrain toward the Everglades means high water tables and wind-driven rain. Flood-zone elevation, foundation details and how a new roof ties into an existing one all deserve attention. Much of the housing is concrete block and stucco with concrete tile or shingle roofs, so an addition has to match or properly tie into that construction. HOA-governed and gated communities are very common on the western side of town, and many require architectural approval before you apply for a permit.

Permits, inspections and close-out in Davie

In Davie, the usual path begins with a building permit, typically with zoning or site-plan review, signed and sealed engineered plans and energy calculations. Flood, septic or well and utility approvals may also apply. Next come inspections, usually in-progress checks while framing, anchoring and fastening are still visible, then a final inspection. Exact inspections vary by city, so confirm the sequence with Davie's building department. Because Davie is in Broward County's High-Velocity Hurricane Zone, exterior products such as windows, doors and roofing need a Miami-Dade Notice of Acceptance. After the final inspection, the permit should be closed out. Unpermitted or open permits can surface at sale, mortgage review or insurance renewal and may be cited by code enforcement. Florida requires new homes and structural additions to be built by a licensed contractor, with separately licensed electrical, plumbing and mechanical subcontractors. Owner-builder permits exist with significant restrictions. Confirm the correct classification with the Florida DBPR, which oversees the Construction Industry Licensing Board.

Verify our licenses at Florida DBPR.

Problems to watch for in Davie

Roof tie-in at the new addition

Where a new roof meets an existing tile or shingle roof, flashing and slope transitions can leak in Davie's wet season if they are not detailed correctly. Wind-driven rain exposes weak joints quickly.

Wind design in the HVHZ

Davie is in Broward County, so the addition's exterior envelope has to meet High-Velocity Hurricane Zone requirements. Windows, doors and roofing products need Miami-Dade Notices of Acceptance.

Flood and high water table

Low, canal-laced terrain west toward the Everglades can affect slab height, foundation drainage and flood-elevation requirements. Check these during design, not after the slab is poured.

Setbacks on large and ranch-style lots

Davie's large-lot zoning can make placement of an addition, guest quarters or outbuilding a zoning question. Confirm setbacks before drawings are finalized.

HOA approval delays

In gated and HOA communities on the west side, an association may need to approve plans before you submit for a permit. Starting that review early avoids stalled schedules.

Matching older block-and-stucco homes

Homes built from the 1970s through the 2000s are often block and stucco. Tying new framing, walls and finishes into them takes planning so the addition looks original and carries loads properly.

Unpermitted or open permits

Unpermitted work or an open permit can come up at sale, mortgage review or insurance renewal. Code enforcement may also cite it.

What we do

  • Room and second-story additionsWe build additions designed to the Florida Building Code wind requirements for Broward County and tied into your existing structure and roof.
  • Porch and patio enclosuresStructural enclosures turn covered space into living area, with permitted framing, openings and approved products.
  • New single-family constructionWe manage new homes from site plan through final inspection, using separately licensed electrical, plumbing and mechanical subcontractors where the work calls for them.
  • Drawings and engineering coordinationWe coordinate the signed and sealed plans, energy calculations and any flood or site approvals your Davie project needs.
  • Staged inspections to finalWe schedule the inspections, pass them and close the permit, because a job is finished when it is permitted, inspected and closed out.

When to call

Site work, foundations and dry-in are generally easiest in the November–April dry season. The summer rainy season and the June 1–November 30 hurricane season can bring weather delays, and post-storm periods can strain inspectors, labor and materials. Davie's afternoon thunderstorms in summer are another scheduling factor. To plan an addition or new build, call (954) 620-7812 or use the quote form on this page for a free estimate and a written scope.

We serve Davie, including Pine Island Ridge, Forest Ridge, Rolling Hills, Shenandoah, Ivanhoe, Hawkes Bluff, Long Lake Ranches, Old Davie / Downtown Davie, the Nova Drive education center area, and the Flamingo Road, Griffin Road and Orange Drive areas.

Additions & New Construction in Davie: questions we hear

Does an addition in Davie need a permit?
Yes, a building permit is always required for an addition, usually alongside zoning review and engineered plans. Confirm the specifics with Davie's building department.
Do I need Miami-Dade product approval for an addition in Davie?
Davie is in Broward County, part of the High-Velocity Hurricane Zone. Exterior products such as windows, doors and roofing installed there need a Miami-Dade Notice of Acceptance.
My Davie home is in an HOA. Who handles approval?
Many gated and HOA communities on the west side of Davie require architectural approval before work begins. Check your association's process early so approval does not hold up the permit.
Can I build on a large or equestrian-zoned lot in Davie?
Davie kept large-lot and ranch-style zoning, so setbacks and site-plan rules matter for additions and outbuildings. We help coordinate drawings and zoning questions, and the city's building and zoning staff have the final word.
What happens when the work is finished?
After the final inspection, the permit is closed out. We handle that step, since an open or unpermitted job can cause trouble at sale, with lenders or with code enforcement.

Request a free additions & new construction estimate in Davie

Tell us about the project. A state-certified contractor will get back to you.

Prefer to talk?

(954) 620-7812

We only use your details to respond to your request. See our privacy policy.

(954) 620-7812Free estimate